New build, Achmelvich
2024. Erection of new building, Balchladdich.
New build, Achmelvich Read More »
2024. Erection of new building, Balchladdich.
New build, Achmelvich Read More »
2025. Fabrication and Installation of a replacement short span estate road bridge, with new steel beams and precast concrete deck panels. Glencalvie The old bridge had become unsafe. Formwork detail. Working under the watchful eye of the Estate’s pet deer. Placing the steel beams and precast concrete sections.
Water of Glencalvie Bridge Read More »
2024. Erection of multi-functional steel building, from foundations to finishings. Loch Assynt. The site was at a remote location. We used our own all terrain plant to mix concrete on site. The building includes a game larder – fitted into place and with its own entrance.
Storage shed with built-in larder Read More »
2023 Refurbishment and erection of extension at the Old Post Office, Clashnessie Bay. The building had been vacant for some time and there was extensive water damage. The old house was gutted and new floors, ceilings, walls and bespoke solid oak doors were fitted.
Clashnessie Old Post Office Read More »
2022-2023 Invershin Refurbishment of the whole front part of the building, which was an old extension.
Invershin Hotel front extension Read More »
2021-2022 Clachtoll, Lochinver Project management, foundations, joinery, plumbing, all interior and exterior finishings, landscaping. Passivhaus is a low energy standard developed in Germany that reduces the heating required by a building to negligible levels, thus negating a traditional heating system requirement. Part of the building was done during the winter months. The building is well
Caber House passivhaus at Clachtoll Read More »